How To Ground A Meter Box

How To Ground A Meter Box. The primary method must be your city water pipe if you have one and it is metal. The meter box is installed within either of these;

Where should I connect the green ground wire in main panel
Where should I connect the green ground wire in main panel from diy.stackexchange.com

A step by step installing a new meter how to install correct grounding and installing ground rod. As a recessed gas meter box doesn't protrude out of the wall nearly as much as a surface mounted meter box, it shouldn't cause any obstructions. With the hot and dry conditions in southern saskatchewan, drastic ground shifting is resulting in damaged meter boxes.

Replacing A 200 Amp Main Meter Main From Start To Finish.


The meter can, or 3. Generally the meter box, the disconnect and the main panel all need to be bonded (connected via a ground wire) to the earth ground (one or two buried ground rods or sometimes a buried metal water pipe) through a common ground wire. What is required is that one end land on the grounding electrode (the first five feet) and the other end could land at any accessible point on the metal water pipe up to and including the far end to the hot water pipe.

Now, Cut 1Inch At The End Of The Wire With A Wire Stripper.


Since the main breaker is in this panel, the main bonding jumper, the screw through the neutral bar into the metal can, connects the equipment ground bar to the neutral. If it is a meter main combo, with an extended service, the neutral and ground must be bonded together at the meter main combo and separated at the interior panel. Secondary methods can be ground rods, foundation rebar or structural metal, some types of underground piping, or a few other rare types.

This Type Of Installation Requires The Cavity Wall Of A Building Or A Pillar Enclosure.


It is built into the wall and not screwed or nailed on. Next, unscrew one of them and then push the copper ground wire on it. Grounding is necessary to prevent fi res starting from a surface arc within the home.

The Grounded Conductor Of The System Will Perform This Function Due To The Connection To The Grounding Electrode System Installed At The Premises Served.


Connect these by running the wire through the clamp on the rod nearest the service panel to the furthest. The meter box is installed within either of these; Based on 2008 nec, the first panel after the meter requires at least two grounding electrodes.

With The Hot And Dry Conditions In Southern Saskatchewan, Drastic Ground Shifting Is Resulting In Damaged Meter Boxes.


Some localities require installation of two grounding rods. Where you run into issues is what the op has, is that the power company can make there own rules on what they allow. It is convenience that lands the bonding jumper on both sides of the meter not a requirement.